Contact Form
Please use WeChat to scan the QR code
REQUEST A QUOTE

Professional Technology

Benefit from our continuous effort to the optimized solution and our several manufacturing bases, our company is to attribute our effort to provide high-quality and economic solar mounting products and bring the added value to our customers.

Double ramming pile

CG301 Double ramming pile solution

ADVANTAGES OF PUNCHING PILE

Simple and fast installation Instead of preparing cement base in advance the vertical shaft is punched into the ground (pile driving depth: 1500-2000mm) by a pile driver which greatly saves the installation time and cost.

Strong adaptability to installation site Punching pile has lower requests for surface flatness than traditional cement foundation and is its installation is not affected by the seasons.

Compatible with all type of structures The head of the punching pile can be adapted to whatever the customer’s need is (for example we have punching piles with flange plate and without flange plate)

Environmental friendly Without performing and preparation works the surrounding areas remain unspoiled. Besides without corruption and zero disposal costs the pile is totally recyclable complying with the environmental protection concept.

Easy and quick relocation Punching pile is easy to remove so that the installation site can be reused.

Components
Data
Installation Notes
Contact supplier

Installation siteopen area, lake and wetland
Installation anglefrom 5°to 40°,according to customer’s feasibility study
Modulepoly/mono/thin film
MaterialHDG Steel/POSMAC Q235B&AL6063-T5
Surface TreatmentHot-dip galvanizing & anodizing
Wind loadup to 57m/s
Snow load0.5KN/M²
FoundationRamming pile
Anti-corrosiveHDG/VCI/SEBF

If you are interested in our products

please feel free to send an e-mail to [email protected]

Or call us: +86 512 58939921